The Schemes Register Indian government scheme data · and what is missing from it
Last complete collection today ·snapshot 2026-09-02 · 4,771 of 4,772 records · 48/48 pages ·verdict COMPLETE ·2 snapshot(s) held
Route · /scheme/cdpnerwa

CDPNER:WA

Coffee Development Programme in North Eastern Region: Water Augmentation
NationwideIndividualCentralCentral Sector SchemeMinistry Of Commerce And IndustryNo start date
myScheme’s own wording, reproduced in full. Where it is thin, that is the finding, and the completeness checks are below.

What this is

The scheme "Coffee Development Programme in North Eastern Region: Water Augmentation" aims to improve the productivity and quality of coffee by facilitating the creation of infrastructure for water augmentation for irrigation and wet processing of coffee.

In detail

The scheme "Coffee Development Programme in North Eastern Region: Water Augmentation" is a Sub-Component of the Scheme "Integrated Coffee Development Project During the Medium Term Framework (MTF) Period: Development Support to Stakeholders" by the Coffee Board, Department of Commerce, Ministry of Commerce and Industry. This scheme aims to improve the productivity and quality of coffee by facilitating the creation of infrastructure for water augmentation for irrigation and wet processing of coffee.

Who qualifies

  • The applicant must be a tribal grower.
  • The applicant should not have received a subsidy for Water Augmentation during the XII plan period.
  • The land records must be in the beneficiary's name.
  • These records should be certified by the Village Authority/State Government/Competent Authority.

Eligible Activities

Installation of the water storage tank, open well, and irrigation equipment (sprinkler/drip) to enhance production, productivity, and quality.

Location Specifications

  • Water storage tank construction can be above or below ground level.
  • Water augmentation structures must be on the estate or within its vicinity.

What you get

Subsidy Details

  • The eligible subsidy for water harvesting structures and sprinkler units is 75% of the unit cost, capped at a maximum ceiling of ₹1,25,000 for all related activities combined.
  • For below-ground water storage tanks, the subsidy is based on the lower value between dimension and unit cost applicable to the size of the holding.
  • For above-ground water storage tanks, the subsidy is based on the lower value between the actual cost or the unit cost applicable to the below-ground water tank.

Subsidy Availability

Growers can claim subsidies for water harvesting structures and irrigation equipment either simultaneously or at different times.

Unit Cost and Subsidy for Water Harvesting Structures

Size of HoldingDimension of Water Harvesting StructureTotal Unit Cost (₹)Subsidy AmountUp to 2 Ha.30' x 30' x 10' (9000 Cft.)₹43,000.0075% of Unit Cost2 Ha to 4 Ha & above43' x 43' x 10' (18490 Cft.)₹89,000.0075% of Unit CostUnit Cost and Subsidy for Sprinkler/Drip Unit

Size of HoldingTotal Unit Cost (₹)Subsidy AmountUp to 1.00 Ha. ₹60,000 75% of the Unit Cost1.00 to 2.00 Ha. & above ₹1,20,000 75% of the Unit Cost

Listed by myScheme
Documentation completeness
6 of 9 checks passed
Checks are about the record,
not about the scheme.
Eligibility published here657 characters
Benefit amount published hereamount or quantity stated
Description more than a name255 characters
Implementing agency published herefield absent from the record
How to apply published hereoffline mode declared, no URL needed
Start date published herenot published
End date published hereno end date recorded, so indefinite by omission
Stored links well-formedall parse
Not expired while still listedno end date
Something missing or wrong on this page? This register only knows what four government sources publish. If you know where the real figure lives, a link to the notification or order is what lets us publish it. Tell us on GitHub

Provenance

Every field above, and where it came from
schemeNameCoffee Development Programme in North Eastern Region: Water AugmentationmyScheme · 2026-09-02
schemeOpenDate...not published at source
schemeCloseDate...not published at source
nodalMinistryNameMinistry Of Commerce And IndustrymyScheme · 2026-09-02
dbtSchemeTruemyScheme · 2026-09-02
achievement data...no source publishes this for any central scheme