The Schemes Register Indian government scheme data · and what is missing from it
Last complete collection today ·snapshot 2026-09-02 · 4,771 of 4,772 records · 48/48 pages ·verdict COMPLETE ·2 snapshot(s) held
Route · /scheme/gsevp

GSEVP

Gujarat State Electric Vehicle Policy
GujaratIndividualState/ UTNo start date
myScheme’s own wording, reproduced in full. Where it is thin, that is the finding, and the completeness checks are below.

What this is

The policy aims to transition Gujarat's transportation sector towards electric mobility and establish the state as a manufacturing hub for electric vehicles. It provides subsidies for electric vehicle purchases and charging infrastructure development to promote sustainable transportation.

In detail

The "Gujarat State Electric Vehicle Policy 2021" by the Ports and Transport Department, Government of Gujarat, aims to transition the state's transportation sector towards electric mobility, make Gujarat a manufacturing hub for electric vehicles and ancillary equipment, encourage start-ups and investment in the field of electric mobility, and improve environmental quality by reducing air pollution. The policy provides capital subsidies up to ₹10,000/- per kilowatt hour for electric vehicle purchases and 25% capital subsidy on equipment for charging infrastructure limited up to ₹10,00,000/- per station for the first 250 commercial public electric vehicle charging stations. The policy is implemented by the Ports and Transport Department as the nodal department with Energy and Petrochemicals Department handling charging station subsidies.

Who qualifies

##### Electric Vehicle Purchase Subsidy

  • The applicant must purchase electric vehicles that have taken subsidy under Government of India's Faster Adoption and Manufacturing of Hybrid and Electric Vehicles in India Scheme dated 8th March 2019 and any amendments thereafter.
  • The applicant must ensure the vehicle's ex-factory price falls within the prescribed threshold limits for each segment.
  • The applicant must not have claimed subsidy under any other state government scheme run by different departments.
  • The applicant must authenticate documents for vehicle purchase to receive Direct Benefit Transfer.

##### Charging Infrastructure Subsidy

  • The applicant must set up commercial public electric vehicle charging stations for 2-wheelers, 3-wheelers, and 4-wheelers.
  • The applicant must not have availed subsidies under any other promotional schemes under Government of India policies or schemes.
  • The applicant must ensure charging stations meet guidelines and standards of Ministry of Power Circular dated 1st October 2019 and any amendments thereafter.
  • The applicant must be among the first 250 commercial public electric vehicle charging station developers.

##### Manufacturing Incentives

  • The applicant must be involved in manufacturing electric vehicles and their components.
  • The applicant must comply with provisions of Gujarat Industrial Policy-2020 and subsequent applicable policies.

What you get

> Electric Vehicle Purchase Incentives

  • 2-Wheeler: ₹10,000/- per kilowatt hour (maximum ex-factory price ₹1,50,000/-)
  • 3-Wheeler: ₹10,000/- per kilowatt hour (maximum ex-factory price ₹5,00,000/-)
  • 4-Wheeler: ₹10,000/- per kilowatt hour (maximum ex-factory price ₹15,00,000/-)

> Charging Infrastructure Incentives

  • Capital Subsidy: 25% on equipment/machinery limited up to ₹10,00,000/- per station
  • Electricity Duty Exemption: 100% exemption for electric vehicle charging stations during policy period
  • Eligibility: First 250 commercial public electric vehicle charging stations

> Manufacturing Benefits

All provisions of Gujarat Industrial Policy-2020 applicable to electric vehicle manufacturing sector

Support for setting up or upgrading facilities for electric vehicle manufacturing

> Conditions

_*The beneficiary can avail subsidy under only one state government scheme and cannot claim subsidy under multiple schemes._

_*Maximum subsidy amount is limited to maximum battery capacity of the vehicle._

_*Maximum subsidy should not exceed 40% of ex-factory price of the vehicle._

_*The amount whichever is less will be given as subsidy to the beneficiary._

_*Charging stations must adhere to Ministry of Power guidelines and standards dated 01.10.2019._

_*Charging station subsidy available only to those who have not availed subsidies under any other Government of India schemes._

Who is excluded

Agriculture connection holders cannot charge electric vehicles from existing connections under existing tariff.

Listed by myScheme
Documentation completeness
6 of 9 checks passed
Checks are about the record,
not about the scheme.
Eligibility published here1448 characters
Benefit amount published hereamount or quantity stated
Description more than a name289 characters
Implementing agency published herefield absent from the record
How to apply published hereoffline mode declared, no URL needed
Start date published herenot published
End date published hereno end date recorded, so indefinite by omission
Stored links well-formedall parse
Not expired while still listedno end date
Something missing or wrong on this page? This register only knows what four government sources publish. If you know where the real figure lives, a link to the notification or order is what lets us publish it. Tell us on GitHub

Provenance

Every field above, and where it came from
schemeNameGujarat State Electric Vehicle PolicymyScheme · 2026-09-02
schemeOpenDate...not published at source
schemeCloseDate...not published at source
nodalMinistryName...myScheme · 2026-09-02
dbtSchemeFalsemyScheme · 2026-09-02
achievement data...no source publishes this for any central scheme