Route · /scheme/integrated-development-of-wild-life-habitats
Integrated Development of Wild Life Habitats
Named by 2 government source(s), and not listed on myScheme
CAG audit reportsDBT BharatNot on myScheme
No documentation checks for this scheme
The nine checks measure what myScheme publishes about a scheme. There is no myScheme
record here to measure, so this page shows none. A score of nought would read
as a verdict on the scheme when it is a fact about the portal.
What the CAG’s reports record
How the scheme was set up, as the Comptroller and Auditor General’s
reports state it, cited to the printed page. Never what an audit found.
| Type | Centrally Sponsored Scheme named in the report “Integrated Development of Wildlife Habitats / Project Tiger” | Comptroller and Auditor General of India, Report No. 1 of 2022, Performance Audit on Wildlife Conservation and Sustainable Management of Wildlife Habitats in Madhya Pradesh, Government of Madhya Pradesh, para 1.3, p. 4. |
| Funding | grants from the Ministry of Environment, Forest and Climate Change on State requests named in the report “Integrated Development of Wildlife Habitats (CSS for protected areas)” under Ministry of Environment, Forest and Climate Change | Comptroller and Auditor General of India, Report No. 1 of 2022, Performance Audit on Wildlife Conservation and Sustainable Management of Wildlife Habitats in Madhya Pradesh, Government of Madhya Pradesh, para 2.4, p. 20. |
What each source says
Every figure below is from a government document, named and dated
| DBT Bharat | central list |
What myScheme says
| myScheme record | ... no entry found in the 2026-10-17 snapshot, under a generous name match | ... |