JJM
Jal Jeevan Mission
NationwideFamilyInstitutionIndividualCentralMinistry Of Jal ShaktiOpen since 2019-08-15
myScheme’s own wording, reproduced in full. Where it is thin, that is the finding, and the completeness checks are below.
What this is
Jal Jeevan Mission, is envisioned to provide safe and adequate drinking water through individual household tap connections by 2024 to all households in rural India.
In detail
The programme will also implement source sustainability measures as mandatory elements, such as recharge and reuse through grey water management, water conservation, rainwater harvesting.
The Jal Jeevan Mission will be based on a community approach to water and will include extensive Information, Education and communication as a key component of the mission.
#### Objectives:
- The broad objectives of the Mission are to provide FHTC to every rural household, schools, anganwadi centres, GP buildings, health centres, wellness centres and community buildings and to monitor FHTC;
- To prioritize provision of FHTCs in quality affected areas, villages in drought-prone and desert areas, Sansad Adarsh Gram Yojana (SAGY) villages, etc.;
- To promote and ensure voluntary ownership among local community by way of contribution in cash, kind and/ or labour and voluntary labour (shramdaan);
- To assist in ensuring the sustainability of water supply system, i.e. water source, water supply infrastructure, and funds for regular O&M;
- To empower and develop human resource in the sector such that the demands of construction, plumbing, electrical, water quality management, water treatment, catchment protection, O&M, etc. are taken care of in short and long term; and to bring awareness on various aspects and significance of safe drinking water and involvement of stakeholders in manner that make water everyone's business.
Who qualifies
This scheme is applicable to all households in rural India.
The CAG has audited this
3 reports tabled
· Comptroller and Auditor General of India
| Report | Kind | Government | Tabled | Read it |
|---|---|---|---|---|
| Report No. 2 of 2026 : Report of the Comptroller and Auditor General of India on Performance Audit of Jal Jeevan Mission in Chhattisgarh for the period ended March 2024 | Performance | Chhattisgarh | 26 July 2014 | CAG |
| Report of the Comptroller and Auditor General of India on Implementation of Jal Jeevan Mission - Report No. 12 of 2025 | Performance | Karnataka | 24 March 2026 | CAG |
| Report No. 10 of 2025 - Jal Jeevan Mission | Performance | Kerala | 24 February 2026 | CAG |
That a report exists, and nothing about what it found
This register records which schemes have been audited, which the CAG does not publish
as a list. It does not read, quote or summarise an audit’s conclusions: those are
the CAG’s to publish and the reports are linked above. The match is on the
report’s subject at high similarity and every one was read by eye; the rules that
were tried and rejected are named on /audit.
What the CAG’s reports record
How the scheme was set up, as the Comptroller and Auditor General’s
reports state it, cited to the printed page. Never what an audit found.
| Began | 15 August 2019 under Government of India | Comptroller and Auditor General of India, Report No. 5 of 2026, Performance Audit on Implementation of Jal Jeevan Mission in Madhya Pradesh, Government of Madhya Pradesh, para 1.1.1, p. 2. |
| Began | August 2019 under Ministry of Jal Shakti | Comptroller and Auditor General of India, Report No. 12 of 2025, Implementation of Jal Jeevan Mission, Government of Karnataka, para 1.1, p. 1. |
| Began | 15 August 2019 named in the report “Jal Jeevan Mission (JJM)” | Comptroller and Auditor General of India, Report of 2026, Performance Audit on Jal Jeevan Mission, Government of Maharashtra, para 1.2, PDF p. 168. |
| Began | 2009, by modifying the Accelerated Rural Water Supply Programme named in the report “National Rural Drinking Water Programme” the register’s sources differ: myScheme: open date 2019-08-15 (myScheme dates the 2019 renaming as JJM) | Comptroller and Auditor General of India, Report No. 5 of 2026, Performance Audit on Implementation of Jal Jeevan Mission in Madhya Pradesh, Government of Madhya Pradesh, para 1.1, p. 1. |
| Began | 2009, by modifying earlier programmes named in the report “National Rural Drinking Water Programme (NRDWP)” the register’s sources differ: myScheme: open date 2019-08-15 (myScheme dates the 2019 renaming as JJM) | Comptroller and Auditor General of India, Report of 2026, Performance Audit on Jal Jeevan Mission, Government of Maharashtra, para 1.1, PDF p. 168. |
| Began | April 2009, by modifying the Accelerated Rural Water Supply Programme and subsuming earlier sub-missions named in the report “National Rural Drinking Water Programme (NRDWP)” the register’s sources differ: myScheme: open date 2019-08-15 (myScheme dates the 2019 renaming as JJM) | Comptroller and Auditor General of India, Report No. 15 of 2018, Performance Audit of National Rural Drinking Water Programme, Union Government (Civil), Ministry of Drinking Water and Sanitation, para 1.1, p. 1. |
| Renamed | Renamed Jal Jeevan Mission from 15 August 2019 named in the report “National Rural Drinking Water Programme” | Comptroller and Auditor General of India, Report No. 3 of 2023, Performance Audit of Rural and Urban Water Supply Schemes, Government of Haryana, Appendix 1, p. 69. |
| Type | Centrally Sponsored Scheme, cost shared between Centre and States named in the report “National Rural Drinking Water Programme (NRDWP)” | Comptroller and Auditor General of India, Report No. 15 of 2018, Performance Audit of National Rural Drinking Water Programme, Union Government (Civil), Ministry of Drinking Water and Sanitation, Executive Summary, p. viii. |
| Funding | 50:50 Centre:State for the coverage component (household tap connections), Maharashtra named in the report “Jal Jeevan Mission (JJM)” | Comptroller and Auditor General of India, Report of 2026, Performance Audit on Jal Jeevan Mission, Government of Maharashtra, para 1.5, p. 4. |
| Benefit | 55 litres per person a day (70 in desert areas) | Comptroller and Auditor General of India, Report No. 3 of 2023, Performance Audit of Rural and Urban Water Supply Schemes, Government of Haryana, Executive Summary, p. vii. |
| Accelerated Rural Water Supply Programme, replaced by this | ||
|---|---|---|
| Began | 1972 | Comptroller and Auditor General of India, Report No. 5 of 2026, Performance Audit on Implementation of Jal Jeevan Mission in Madhya Pradesh, Government of Madhya Pradesh, para 1.1, p. 1. |
| Accelerated Rural Water Supply Programme (ARWSP), replaced by this | ||
| Renamed | National Rural Drinking Water Programme (NRDWP) from April 2009 | Comptroller and Auditor General of India, Report No. 4 for the year ended 31 March 2011, West Garo Hill District, Government of Meghalaya, para 5.3, p. 32. |
| Renamed | modified into NRDWP in 2009 | Comptroller and Auditor General of India, Report No. 15 of 2018, Performance Audit of National Rural Drinking Water Programme, Union Government (Civil), Ministry of Drinking Water and Sanitation, para 1.1, p. 1. |
| Funding | 100 per cent centrally sponsored | Comptroller and Auditor General of India, Report No. 4 for the year ended 31 March 2011, West Garo Hill District, Government of Meghalaya, para 5.3, p. 32. |
| National Rural Drinking Water Quality Monitoring and Surveillance Programme (WQM&SP), replaced by this | ||
| Began | February 2006; subsumed into NRDWP from April 2009 | Comptroller and Auditor General of India, Report No. 15 of 2018, Performance Audit of National Rural Drinking Water Programme, Union Government (Civil), Ministry of Drinking Water and Sanitation, para 4.8, p. 78. |
Found elsewhere in government
Not published on myScheme · carried from another
government source, with the join score shown so it can be disputed
What it promises to deliver this year
Outcome Budget 2026-27, Output Outcome Monitoring Framework, p.191 · matched at
1.0 (strong)
| Indicator | Measure | Target 2026-27 |
|---|---|---|
| output 1.1 | Number of HGJ265 | 170,000.00 |
| output 1.2 | Number of HGJ | 130,000.00 |
Indicator wording is the first line of a
wrapped cell in the source PDF; target values are complete. The framework carries
targets and no achieved-versus-promised column, for this scheme or any
other.
Why this is here and not above
myScheme publishes no budget figure for any scheme. This one comes from the Union
Budget Expenditure Profile and is joined by name, so it is shown apart from the
checks and never counted in them. A scheme’s launch date, likewise, exists in
its gazette notification whether or not the portal repeats it. The checks
above ask only whether this portal tells a citizen, which is a different
and narrower question.
Listed by Union BudgetCAG audit reportsmySchemeOutcome Budget
Documentation completeness
4 of 9 checks passed
Checks are about the record,
not about the scheme.
not about the scheme.
✗
Eligibility published here60 characters
✗
Benefit amount published herefield empty
✓
Description more than a name165 characters
✗
Implementing agency published herefield absent from the record
✓
How to apply published hereoffline mode declared, no URL needed
✓
Start date published here2019-08-15
✗
End date published hereno end date recorded, so indefinite by omission
✗
Stored links well-formed2 of 2: leading or trailing whitespace; leading or trailing whitespace
✓
Not expired while still listedno end date
Malformed URL in a stored field
reference field: leading or trailing whitespace
reference field: leading or trailing whitespace
https://jalshakti-ddws.gov.in/sites/default/files/JJM_Operational_Guidelines.pdf reference field: leading or trailing whitespace
https://ejalshakti.gov.in/jjmreport/JJMIndia.aspx reference field: leading or trailing whitespace
Something missing or wrong on this page?
This register only knows what four government sources publish. If you know where the
real figure lives, a link to the notification or order is what lets us publish it.
Tell us on GitHub
Provenance
Every field above, and where it came from
| schemeName | Jal Jeevan Mission | myScheme · 2026-10-17 |
| schemeOpenDate | 2019-08-15 | myScheme · 2026-10-17 |
| schemeCloseDate | ... | not published at source |
| nodalMinistryName | Ministry Of Jal Shakti | myScheme · 2026-10-17 |
| dbtScheme | False | myScheme · 2026-10-17 |
| achievement data | ... | no source publishes this for any central scheme |