JJM

Jal Jeevan Mission
NationwideFamilyInstitutionIndividualCentralMinistry Of Jal ShaktiOpen since 2019-08-15
myScheme’s own wording, reproduced in full. Where it is thin, that is the finding, and the completeness checks are below.

What this is

Jal Jeevan Mission, is envisioned to provide safe and adequate drinking water through individual household tap connections by 2024 to all households in rural India.

In detail

The programme will also implement source sustainability measures as mandatory elements, such as recharge and reuse through grey water management, water conservation, rainwater harvesting.

The Jal Jeevan Mission will be based on a community approach to water and will include extensive Information, Education and communication as a key component of the mission.

#### Objectives:

  • The broad objectives of the Mission are to provide FHTC to every rural household, schools, anganwadi centres, GP buildings, health centres, wellness centres and community buildings and to monitor FHTC;
  • To prioritize provision of FHTCs in quality affected areas, villages in drought-prone and desert areas, Sansad Adarsh Gram Yojana (SAGY) villages, etc.;
  • To promote and ensure voluntary ownership among local community by way of contribution in cash, kind and/ or labour and voluntary labour (shramdaan);
  • To assist in ensuring the sustainability of water supply system, i.e. water source, water supply infrastructure, and funds for regular O&M;
  • To empower and develop human resource in the sector such that the demands of construction, plumbing, electrical, water quality management, water treatment, catchment protection, O&M, etc. are taken care of in short and long term; and to bring awareness on various aspects and significance of safe drinking water and involvement of stakeholders in manner that make water everyone's business.

Who qualifies

This scheme is applicable to all households in rural India.

The CAG has audited this

3 reports tabled · Comptroller and Auditor General of India
ReportKindGovernmentTabled Read it
Report No. 2 of 2026 : Report of the Comptroller and Auditor General of India on Performance Audit of Jal Jeevan Mission in Chhattisgarh for the period ended March 2024PerformanceChhattisgarh26 July 2014CAG
Report of the Comptroller and Auditor General of India on Implementation of Jal Jeevan Mission - Report No. 12 of 2025PerformanceKarnataka24 March 2026CAG
Report No. 10 of 2025 - Jal Jeevan MissionPerformanceKerala24 February 2026CAG
That a report exists, and nothing about what it found This register records which schemes have been audited, which the CAG does not publish as a list. It does not read, quote or summarise an audit’s conclusions: those are the CAG’s to publish and the reports are linked above. The match is on the report’s subject at high similarity and every one was read by eye; the rules that were tried and rejected are named on /audit.

What the CAG’s reports record

How the scheme was set up, as the Comptroller and Auditor General’s reports state it, cited to the printed page. Never what an audit found.
Began15 August 2019
under Government of India
Comptroller and Auditor General of India, Report No. 5 of 2026, Performance Audit on Implementation of Jal Jeevan Mission in Madhya Pradesh, Government of Madhya Pradesh, para 1.1.1, p. 2.
BeganAugust 2019
under Ministry of Jal Shakti
Comptroller and Auditor General of India, Report No. 12 of 2025, Implementation of Jal Jeevan Mission, Government of Karnataka, para 1.1, p. 1.
Began15 August 2019
named in the report “Jal Jeevan Mission (JJM)”
Comptroller and Auditor General of India, Report of 2026, Performance Audit on Jal Jeevan Mission, Government of Maharashtra, para 1.2, PDF p. 168.
Began2009, by modifying the Accelerated Rural Water Supply Programme
named in the report “National Rural Drinking Water Programme”
the register’s sources differ: myScheme: open date 2019-08-15 (myScheme dates the 2019 renaming as JJM)
Comptroller and Auditor General of India, Report No. 5 of 2026, Performance Audit on Implementation of Jal Jeevan Mission in Madhya Pradesh, Government of Madhya Pradesh, para 1.1, p. 1.
Began2009, by modifying earlier programmes
named in the report “National Rural Drinking Water Programme (NRDWP)”
the register’s sources differ: myScheme: open date 2019-08-15 (myScheme dates the 2019 renaming as JJM)
Comptroller and Auditor General of India, Report of 2026, Performance Audit on Jal Jeevan Mission, Government of Maharashtra, para 1.1, PDF p. 168.
BeganApril 2009, by modifying the Accelerated Rural Water Supply Programme and subsuming earlier sub-missions
named in the report “National Rural Drinking Water Programme (NRDWP)”
the register’s sources differ: myScheme: open date 2019-08-15 (myScheme dates the 2019 renaming as JJM)
Comptroller and Auditor General of India, Report No. 15 of 2018, Performance Audit of National Rural Drinking Water Programme, Union Government (Civil), Ministry of Drinking Water and Sanitation, para 1.1, p. 1.
RenamedRenamed Jal Jeevan Mission from 15 August 2019
named in the report “National Rural Drinking Water Programme”
Comptroller and Auditor General of India, Report No. 3 of 2023, Performance Audit of Rural and Urban Water Supply Schemes, Government of Haryana, Appendix 1, p. 69.
TypeCentrally Sponsored Scheme, cost shared between Centre and States
named in the report “National Rural Drinking Water Programme (NRDWP)”
Comptroller and Auditor General of India, Report No. 15 of 2018, Performance Audit of National Rural Drinking Water Programme, Union Government (Civil), Ministry of Drinking Water and Sanitation, Executive Summary, p. viii.
Funding50:50 Centre:State for the coverage component (household tap connections), Maharashtra
named in the report “Jal Jeevan Mission (JJM)”
Comptroller and Auditor General of India, Report of 2026, Performance Audit on Jal Jeevan Mission, Government of Maharashtra, para 1.5, p. 4.
Benefit55 litres per person a day (70 in desert areas)Comptroller and Auditor General of India, Report No. 3 of 2023, Performance Audit of Rural and Urban Water Supply Schemes, Government of Haryana, Executive Summary, p. vii.
Accelerated Rural Water Supply Programme, replaced by this
Began1972Comptroller and Auditor General of India, Report No. 5 of 2026, Performance Audit on Implementation of Jal Jeevan Mission in Madhya Pradesh, Government of Madhya Pradesh, para 1.1, p. 1.
Accelerated Rural Water Supply Programme (ARWSP), replaced by this
RenamedNational Rural Drinking Water Programme (NRDWP) from April 2009Comptroller and Auditor General of India, Report No. 4 for the year ended 31 March 2011, West Garo Hill District, Government of Meghalaya, para 5.3, p. 32.
Renamedmodified into NRDWP in 2009Comptroller and Auditor General of India, Report No. 15 of 2018, Performance Audit of National Rural Drinking Water Programme, Union Government (Civil), Ministry of Drinking Water and Sanitation, para 1.1, p. 1.
Funding100 per cent centrally sponsoredComptroller and Auditor General of India, Report No. 4 for the year ended 31 March 2011, West Garo Hill District, Government of Meghalaya, para 5.3, p. 32.
National Rural Drinking Water Quality Monitoring and Surveillance Programme (WQM&SP), replaced by this
BeganFebruary 2006; subsumed into NRDWP from April 2009Comptroller and Auditor General of India, Report No. 15 of 2018, Performance Audit of National Rural Drinking Water Programme, Union Government (Civil), Ministry of Drinking Water and Sanitation, para 4.8, p. 78.

Found elsewhere in government

Not published on myScheme · carried from another government source, with the join score shown so it can be disputed

What it promises to deliver this year

Outcome Budget 2026-27, Output Outcome Monitoring Framework, p.191 · matched at 1.0 (strong)
IndicatorMeasureTarget 2026-27
output 1.1Number of HGJ265170,000.00
output 1.2Number of HGJ130,000.00
Indicator wording is the first line of a wrapped cell in the source PDF; target values are complete. The framework carries targets and no achieved-versus-promised column, for this scheme or any other.
Why this is here and not above myScheme publishes no budget figure for any scheme. This one comes from the Union Budget Expenditure Profile and is joined by name, so it is shown apart from the checks and never counted in them. A scheme’s launch date, likewise, exists in its gazette notification whether or not the portal repeats it. The checks above ask only whether this portal tells a citizen, which is a different and narrower question.
Listed by Union BudgetCAG audit reportsmySchemeOutcome Budget
Documentation completeness
4 of 9 checks passed
Checks are about the record,
not about the scheme.
✗
Eligibility published here60 characters
✗
Benefit amount published herefield empty
✓
Description more than a name165 characters
✗
Implementing agency published herefield absent from the record
✓
How to apply published hereoffline mode declared, no URL needed
✓
Start date published here2019-08-15
✗
End date published hereno end date recorded, so indefinite by omission
✗
Stored links well-formed2 of 2: leading or trailing whitespace; leading or trailing whitespace
✓
Not expired while still listedno end date
Malformed URL in a stored field
https://jalshakti-ddws.gov.in/sites/default/files/JJM_Operational_Guidelines.pdf
reference field: leading or trailing whitespace
https://ejalshakti.gov.in/jjmreport/JJMIndia.aspx
reference field: leading or trailing whitespace
Something missing or wrong on this page? This register only knows what four government sources publish. If you know where the real figure lives, a link to the notification or order is what lets us publish it. Tell us on GitHub

Provenance

Every field above, and where it came from
schemeNameJal Jeevan MissionmyScheme · 2026-10-17
schemeOpenDate2019-08-15myScheme · 2026-10-17
schemeCloseDate...not published at source
nodalMinistryNameMinistry Of Jal ShaktimyScheme · 2026-10-17
dbtSchemeFalsemyScheme · 2026-10-17
achievement data...no source publishes this for any central scheme