The Schemes Register Indian government scheme data · and what is missing from it
Last complete collection today ·snapshot 2026-09-02 · 4,771 of 4,772 records · 48/48 pages ·verdict COMPLETE ·2 snapshot(s) held
Route · /scheme/lcildrh

LCILDRH

Large cardamom Irrigation Land Development : Rainwater harvesting structure(nos)
NationwideIndividualCentralCentrally Sponsored SchemeMinistry Of Commerce And IndustryNo start date
myScheme’s own wording, reproduced in full. Where it is thin, that is the finding, and the completeness checks are below.

What this is

The scheme aims to motivate the growers to bring more area under irrigation by constructing water storage structures, rain water harvesting structures and installation of irrigation equipments for increasing the productivity and improving quality of large cardamom

In detail

The scheme “Large Cardamom Irrigation Land Development: Rainwater Harvesting Structures (Nos)” is a component of the Integrated Scheme for Export Promotion and Quality Improvement in Spices and Research and Development of Cardamom, implemented during the 15th Finance Commission period (2021–22 to 2025–26) under the Export-Oriented Production component by the Spices Board, India, under the Ministry of Commerce and Industry. The scheme aims to motivate growers to bring more area under irrigation by supporting the construction of water storage structures, rainwater harvesting systems, and the installation of irrigation equipment, thereby increasing productivity and improving the quality of large cardamom.

Who qualifies

  • The applicant should be a large cardamom grower located in Sikkim, Darjeeling and Kalimpong districts of West Bengal, or other North Eastern States.
  • The applicant should undertake construction activities in a manner that does not block the natural flow of water, including streams, and is not objectionable to the local community or concerned authorities.
  • The applicant should ensure that the proposed rainwater harvesting or irrigation structure complies with all local regulations and environmental norms.
  • The applicant should allow inspection by designated officials, who will conduct the final inspection and recommend only eligible cases for assistance.
  • The applicant should ensure that the Inspecting Officer can verify that no violations of the prescribed conditions have occurred before recommending the case for sanction.

What you get

  • 33.33 % of cost of construction subject to a maximum of ₹18,000 per structure for General and 75% subject to maximum of ₹ 40,000 /- per structure for SC/ST
  • The above assistance will be for a structure of 200 cu. Mt. capacity lined with silpauline sheet. For lesser capacity the assistance will be limited proportionate to the water holding capacity.
  • Large cardamom growers having land holding size of 0.10 Ha to 8 Ha Devices can be for harvesting water from direct rainfall as well as surface run off without blocking the natural flow of water including streams.
Listed by myScheme
Documentation completeness
5 of 9 checks passed
Checks are about the record,
not about the scheme.
Eligibility published here854 characters
Benefit amount published hereamount or quantity stated
Description more than a name264 characters
Implementing agency published herefield absent from the record
How to apply published hereno URL and no offline mode declared
Start date published herenot published
End date published hereno end date recorded, so indefinite by omission
Stored links well-formedall parse
Not expired while still listedno end date
Something missing or wrong on this page? This register only knows what four government sources publish. If you know where the real figure lives, a link to the notification or order is what lets us publish it. Tell us on GitHub

Provenance

Every field above, and where it came from
schemeNameLarge cardamom Irrigation Land Development : Rainwater harvesting structure(nos)myScheme · 2026-09-02
schemeOpenDate...not published at source
schemeCloseDate...not published at source
nodalMinistryNameMinistry Of Commerce And IndustrymyScheme · 2026-09-02
dbtSchemeFalsemyScheme · 2026-09-02
achievement data...no source publishes this for any central scheme