The Schemes Register Indian government scheme data · and what is missing from it
Last complete collection today ·snapshot 2026-09-02 · 4,771 of 4,772 records · 48/48 pages ·verdict COMPLETE ·2 snapshot(s) held
Route · /scheme/nhs-west-bengal

NHS- WEST BENGAL

NIJASHAREE HOUSING SCHEME
West BengalFamilyStateNo start date
myScheme’s own wording, reproduced in full. Where it is thin, that is the finding, and the completeness checks are below.

What this is

The scheme “NIJASHAREE HOUSING SCHEME” is an initiative by the Govt. of West Bengal which envisages the construction of multi-storied Lower Income Group (LIG)/Middle Income Group (MIG) flats on the public lands belonging to the State Government, local bodies and parastatals.

In detail

The Government of West Bengal is determined to provide a `Basha’ (house) to all the people belonging to the Lower Income Group (LIG) and the Middle Income Group (MIG). There is a growing demand for housing amongst families belonging to the low and middle-income categories. In order to cater to the housing needs of the Lower Income Group and the Middle Income Group, the Housing Department felt the need to make provisions for affordable housing, and decided to introduce a new Housing Scheme, namely "NIJASHREE HOUSING SCHEME".

Salient Features of The Scheme:

  • The scheme envisages the construction of dwelling units of a minimum of 16 flats in a block of G + 3 buildings on the government lands, lands of local bodies, and other parastatals.
  • 1BHK flats, with a minimum built-up area of 35.15 square meters (378 sq. ft.), will be constructed for the LIG category, and 2BHK flats, having a minimum built-up area of 50.96 square meters (559 sq. ft.), will be constructed for the MIG category.
  • The unit cost will be determined on the basis of the actual cost of construction of the superstructure, substructure, and internal infrastructure including sanitary and plumbing, internal electrification, etc., incidental therein.
  • No cost of land shall be taken into account while computing the unit cost. This freehold land will be treated as a subsidy to the beneficiary.
  • The unit cost and standard built-up area may vary, depending on the location and quantum of the land available, as well as the land development cost and the schedule of rates applicable to the area, at the time of construction.
  • Off-site infrastructure like the construction of internal roads, boundary wall, outside electrification, making of a drainage system, installation of lights in the campus and water supply shall not be added to the cost of the housing development scheme NIJASHREE, i.e., the purchaser will not have to pay for such infrastructure.
  • Credit-linked subsidies to the eligible beneficiaries will be facilitated by the Housing Department, as per the existing scheme.

Who qualifies

  • Monthly family income should be ₹15,000 or less for the Lower Income Group (LIG).
  • Monthly family income should be ₹30,000 or less for the Middle Income Group (MIG).
  • The beneficiary should not have any pucca house/flat in his/her name, or in the name of any family (family includes spouse, unmarried sons or daughters) member in the state.
  • The applicant must be an inhabitant of the same district in which the project is to be implemented.
  • One applicant can apply for one flat only for his/her family. Any person allotted with a flat in the scheme cannot apply for the same scheme in another project in his/her district.

<br>

Note 01: The selection of beneficiaries and allotment of flats will be done through a transparent lottery in the respective district/sub-division.

Note 02: The waiting list of the eligible applicants, consisting of 20% of the total flats under each category (i.e. LIG and MIG), will be prepared in case the number of applicants is more than the number of flats in a particular project.

Listed by myScheme
Documentation completeness
6 of 9 checks passed
Checks are about the record,
not about the scheme.
Eligibility published here1064 characters
Benefit amount published herefield empty
Description more than a name275 characters
Implementing agency published herenamed
How to apply published here1 URL(s) published
Start date published herenot published
End date published hereno end date recorded, so indefinite by omission
Stored links well-formedall parse
Not expired while still listedno end date
Something missing or wrong on this page? This register only knows what four government sources publish. If you know where the real figure lives, a link to the notification or order is what lets us publish it. Tell us on GitHub

Provenance

Every field above, and where it came from
schemeNameNIJASHAREE HOUSING SCHEMEmyScheme &middot; 2026-09-02
schemeOpenDate...not published at source
schemeCloseDate...not published at source
nodalMinistryName...myScheme &middot; 2026-09-02
dbtScheme...myScheme &middot; 2026-09-02
achievement data...no source publishes this for any central scheme